| Transmission Area |
Number of transformers |
Installed capacity (MVA) |
| 400/x |
220/x |
110/x |
Total |
400/ |
220/ |
110/ |
Total |
| Osijek |
2 |
2 |
29 |
33 |
600 |
300 |
829 |
1.729 |
| Rijeka |
2 |
5 |
39 |
46 |
800 |
620 |
984 |
2.404 |
| Split |
2 |
4 |
47 |
53 |
800 |
600 |
1.530 |
2.930 |
| Zagreb |
6 |
4 |
50 |
60 |
1.900 |
600 |
1.618 |
4.118 |
| Croatia |
12 |
15 |
165 |
192 |
4.100 |
2.120 |
4.961 |
11.181 |
Note:
The plants shown in the table are parts of the transmission network in Croatia for which HEP-OPS is authorized. The figures do not include network components and plants destroyed in the war and currently under construction. |